摘要 根据目前滨海厂址的共有特征,以某滨海厂址的工程数据为例,根据不同厂平标高的土石方量、机组不同布置方式及堰顶标高下循环水泵扬程的变化,总结出循环水系统运行最理想的淹没状态及其相应的淹没系数值域区间。根据不同设计潮位对淹没系数的要求,建议采用淹没泄流方式,设计低潮位下淹没系数取0.90作为上限,则其他设计潮位时的淹没系数均小于此值,在减少土石方工程量的同时实现循环水泵扬程最小。 Based on the common features of current coastal sites,a case study was made on a costal nuclear power plant.According to the change of circulating pump head with the amount of earthwork in different flat elevations,different arrangement modes of unit and different weir crest elevations,this paper summarized the most ideal submerged state and the corresponding range of value for submerged coefficient.According to the requirements on submerge coefficients with different designed tide levels,it was recommended that submerge discharging method should be taken and the top limitation for submerge coefficient at designed minimum tide levels should be 0.90.In this way,the submerge coefficient at other tide level would be less than 0.90;as a result,the earth work would be reduced and the minimum pump head would also be achieved.
作者 程道仓
出处 《给水排水》 CSCD 北大核心 2016年第10期74-79,共6页 Water & Wastewater Engineering
关键词 滨海核电厂 循环水泵 虹吸井 堰上水头 淹没系数 值域 Coastal nuclear power plant Circulating cooling pump Siphonic water-collecting well Weir head Submerged coefficient Range of value
  • 相关文献

参考文献5

  • 1广东省电力设计研究院,核工业第二研究设计院.岭澳核电站工程初步设计水工部分.1996.4.
  • 2杨平正,王良中,等.电力工程水务设计手册.北京:中国电力出版社,2005.
  • 3广东省电力设计研究院等.GB/T50958-2013核电厂常规岛设计规范.北京:中国计划出版社,2013.
  • 4深圳中广核工程设计有限公司等.NB/T25020-2014核电厂混凝土蜗壳式循环水泵设计制造规范.北京:中国电力出版社,2014.
  • 5中国广东核电集团有限公司.核电厂直流及二次循环供水系统冷端优化计算软件(CS0).深圳2012.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部