议单位工程内平行发包的不合法性

Non-legitimacy of Parallel Contracting Mode within the Unit Project
下载PDF
导出
摘要 常见的民用单位工程,均应由一个承包单位完成,在单位工程内所谓的平行发包,就是事实上的肢解分包,这违反了建筑法和建筑企业资质管理规定。在单位工程内的平行发包,造成了合同管理的混乱,安全和质量责任无法落实。建设单位见证下的三方合同是解决平行发包的主要途径。 Common units of civil engineering should be completed by one contractor of construction projects, the so-called parallel contract within the unit project was in fact the dismemberment of the subcontract, the violation of law and the regulations for the construction enterprise qualifications. Parallel out-contracting within the units led to confusion with the contract management, safety and quality responsibility cannot be implemented. The contract management of confusion was unable to implement the safety and quality responsibility. The construction unit under the witness of tripartite indenture was the main way to solve the parallel contract.
作者 高盛立
出处 《工程质量》 2016年第9期9-12,共4页 Construction Quality
关键词 单位工程 平行发包 不合法性 专业分包 the unit project: parallel contract: non-legitimacy professional subcontractor
  • 相关文献

参考文献3

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部