摘要
介绍了镇江索普行政办公楼工程通过节点的事先策划、工序过程控制、创优质结构工程的一些主要措施和特色做法,借此与广大同仁相互交流、学习。
This article described the project of Zhenjiang Sopo administration building. Some main characteristics of the measurements and practices for creating high quality structural engineering were introduced, for example, node prior planning, process strictly controlling, and so on. Whereby the majority of my colleagues and the experts could communicate and learn mutually.
出处
《工程质量》
2016年第9期80-82,共3页
Construction Quality
关键词
节点
过程控制
优质结构
特色做法
node
process control: high quality structure: characteristics practice