期刊文献+

洋山港四期全自动化集装箱码头总体布置创新 被引量:11

Innovation on general layout of fully-automated container terminal in Yangshan Port phase Ⅳ project
下载PDF
导出
摘要 结合洋山港四期工程特点以及全自动化装卸工艺模式,围绕着总体布置中需要解决的关键技术问题,提出了相应的创新方法,为全自动化集装箱码头的总体设计奠定了基础,所提出的创新方法可为自动化集装箱码头的设计及规范编制提供参考。 Based on the characteristics of Yangshan Port phase IV project and the mode of fully -automated handlingtechnology, we developed some innovation methods to deal with the key technical problems on the general layout of this project,which laida foundation for the general design of fully-automated container terminal. The innovation methods can provide thereferences for the design and code compilation of fully-automated container terminals.
作者 程泽坤 刘广红 何继红 CHENG Ze-kun LIU Guang-hong HE Ji-hong(CCCC Third Harbor Consultants Co., Ltd., Shanghai 200032, Chin)
出处 《中国港湾建设》 2016年第10期1-7,共7页 China Harbour Engineering
关键词 洋山港四期工程 自动化 集装箱码头 总体布置 全自动化模式 Yangshan Port phase IV project automatization container terminal general layout fully-automated mode
  • 相关文献

同被引文献49

引证文献11

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部