根据目前建设的光伏项目类型及情况,提出了项目前期和施工过程中的相关注意要点,供建设单位等相关部门参考。
According to current photovoltaic construction project types and situation, the article puts forward some key points in pre-project and construction process, which give reference to construction units and relevant departments.
作者
黄志峰
Huang Zhifeng(Shanghai Energy-Saving and Emission-Reducing Center Co.,Lt)
出处
《上海节能》
2016年第9期507-509,共3页
Shanghai Energy Saving
关键词
光伏发电
前期工作
施工
要点分析
Photovoltaic Power Generation, Pre-Project Task, Construction, Key Points Analysis