摘要 针对当前许多单件小批量生产模式下的企业无法为物料需求计划(MRP)提供完整基础数据支持以及订单交货期不能自动调整的问题,提出了一种单件小批量生产模式下的MRP改进模型.首先研究了MRP的数学计算模型,得出基础数据在数量上和时间上的计算关系;然后使用数据对象多粒度化和订单定位平移时间的方法对MRP模型进行柔性化改进,实现了基础数据的柔性化设置和订单交期的自动调整;最后对MRP改进模型的算法进行了设计、分析与实现.实验结果表明改进后的MRP模型在容错性和自适应性方面有了较大的提高. The material requirement planning( MRP) is based on accurate basic data. But many enterprises in jobbing work circumstance were unable to provide the completed basic data support for MRP. The delivered date of sale order usually needed to be adjusted but it could not be done automatically. To solve these problems,an improved MRP model for jobbing working was proposed. Firstly,the mathematical computing model of MRP was studied to find out the computing relations of basic data on quantity and time. Secondly,the improved MRP model was established with multi-granularity data object and time translation of located orders. In this model,the basic data flexible setting and the orders' delivered date automatically adjusting were realized. Lastly,the algorithm of this model was designed,analyzed and implemented. The experimental result shows that the fault tolerance and self-adaption of MRP are greatly improved.
出处 《江苏科技大学学报(自然科学版)》 CAS 北大核心 2016年第4期355-361,共7页 Journal of Jiangsu University of Science and Technology:Natural Science Edition
基金 国家自然科学基金资助项目(61272382) 广东省云机器人(石油化工)工程技术研究中心开放基金资助项目(650007) 茂名市科技计划项目(201323)
关键词 单件小批量 物料需求计划 基础数据 柔性 多粒度 交期调整 jobbing work material requirement planning(MRP) basic data flexible multi-granularity delivered date adjusting
  • 相关文献

参考文献14

  • 1TABITHA L J,DEBORAH F C,SUMALI C, et al. A framework to explore innovation at SAP through bibliometric analysis of patent applications[J].Expert Systems with Applications,2015,42(24):9389-9401.
  • 2NAGPAL S, KHATRI S K, KUMAR A. Comparative study of ERP implementation strategies[C] //LISAT 2015 Systems, Applications and Technology Conference. New York: IEEE, 2015.
  • 3BABAEIA M, GHOLAMIB Z, ALTAFIB S. Challenges of enterprise resource planning implementation in Iran large organizations[J].Information Systems, 2015(54):15-27.
  • 4OZORHON B, CINAR E. Critical success factors of enterprise resource planning implementation in construction: case of turkey[J].Journal of Management in Engineering, 2015,31(6):1-8.
  • 5SEETHAMRAJU R. Adoption of software as a service (SaaS) enterprise resource planning (ERP) systems in small and medium sized enterprises (SMEs)[J].Information Systems Frontiers, 2015, 17(3): 475-492.
  • 6闪四清.ERP系统原理和实施[M].4版.北京:清华大学出版社,2013.
  • 7程控, 革扬. MRP∏/ERP原理与应用[M].3版. 北京:清华大学出版社,2012.
  • 8MILNE R J, WANG C T, YEN C K. Optimized material requirements planning for semiconductor manufacturing[J].Journal of the Operational Research Society,2012,63(11): 1566-1577.
  • 9SADEGHIAN R. Continuous materials requirements planning (CMRP) approach when order type is lot for lot and safety stock is zero and its applications[J].Applied Soft Computing, 2011,11(8):5621-5629.
  • 10ALDIERI A, TOLIO T, URGO M. A project scheduling approach to production and material requirement planning in manufacturingtoorder environments[J].Journal of Intelligent Manufacturing, 2012,23(3):575-585.

二级参考文献19

  • 1[1]Banks,J.,Carson,J.S.,Nelson,B.L.& Nicol,D.M.(2001).Discrete-event System Simulation.Prentice-Hall,New Jersey
  • 2[2]Chatfield,D.,Kim,J.,Harrison,T.& Hayya,J.(2004).The bullwhip effect in supply chains-impact of stochastic lead times,information quality,and information sharing:a simulation study.Production and Operations Management,13(4):340-353
  • 3[3]Chen,F.,Drezner,Z.,Ryan,J.& Simchi-Levi,D.(2000).Quantifying the bullwhip effect in assembly supply chain:the impact of forecasting,lead times and information.Management Science,46(3):436-443
  • 4[4]Chu,C.,Proth,J.M.& Xie,X.(1993).Supply management in assembly systems.Naval Research Logistics,40:933-949
  • 5[5]Dolgui,A.(2001).On a model of joint control of reserves in automatic control systems of production.Automation and Remote Control,62(12):2020-2026
  • 6[6]Dolgui,A.,Portmann,M.C.& Proth,J.M.(1995).Planification de systemes d'assemblage avec approvisionnement aleatoire en composants.Journal of Decision Systems,4(4):255-279
  • 7[7]Dolgui,A.,Portmann,M.C.& Proth,J.M.(1996).A control model of the assembly manufacturing.In:Dolezal,J.,Fidler,J.(Eds.),System Modeling and Optimization.Proceedings of the 17th IFIP TC7 Conference,519-526,Chapman and Hall
  • 8[8]Elhafsi,M.(2002).Optimal leadtimes planning in serial production systems with earliness and tardiness costs.HE Transactions,34:233-243
  • 9[9]Kaplan,R.(1970).Dynamic inventory model with stochastic lead times.Management Science,16:491-507
  • 10[10]Kim,J.G.,Chatfield,D.,Harrison,T.P.& Hayya,J.C.(2006).Quantifying the bullwhip effect in a supply chain with stochastic lead time.European Journal of Operational Research,173 (2):617-636

共引文献1

同被引文献18

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部