预应力工字梁具有跨径大、重量轻、经济合理、施工简单等优点,在公路建设中越来越得到广泛应用。在工程施工中,根据工字梁自身结构特点,抓好质量关键控制点,才能保证工程质量及安全。结合312国道兰州过境段石门沟大桥的施工实践,对预应力混凝土工字梁施工工艺和关键控制点进行归纳总结,有关经验可供相关专业人员参考。
The pre-stressed concrete I-beam has the advantages of long span, light weight, economy,reasonable and simple construction, and is more and more widely used in the highway construction. Based on its structural characteristics of I-beam, only the key control point of quality is mastered better, the engineering quality and safety can be guaranteed in the engineering construction. According to theconstruction practice of Shimengou Bridge in the transit section of Lanzhou in the National Highway 312, the article summarizes the construction technology and key control point of pre-stressed concrete I-beam. The relative experience can be referred for the similar projects.
出处
《城市道桥与防洪》
2016年第10期109-111,共3页
Urban Roads Bridges & Flood Control
关键词
40m工字梁
侧弯控制
张拉管理
边梁架设
弯道运输
40-m I-beam
lateral bending control
tensioning management
erection of side beam
bend transport