摘要
为满足投资管理的需要,业主启动了木坡水电站调整概算的编制。通过对木坡水电站投资增加原因的剖析,反映了地下工程比重大的水电项目建设期间,地质因素、国家政策调整和市场价格变化等因素对项目实际投资的影响,同时分析了设计概算改进的时机,以期对其他水电工程项目调整概算的编制和申报起到借鉴作用。
In order to meet the needs of investment management, the owners started the preparation of budget estimates adjustment of Mupo Hydropower Station. Through analysis of the causes of the increase of investment of Mupo Hydropower Station, the impact of geological factors, national policy adjustments and changes in market prices and other factors on the actual investment of hydropower projects having large underground works proportion is reflected, and the design estimates improved timing is analyzed in order to provide reference for the budget estimates adjustment of other hydropower project.
出处
《价值工程》
2016年第30期33-34,共2页
Value Engineering
关键词
木坡水电站
调整概算
造价
Mupo Hydropower Station
budget estimate adjustment
cost