摘要 在分析长壁老采空区"活化"变形机理的基础上,结合部分开采岩层移动控制理论,对控制老采空区残余沉降的注浆充填的技术方法进行了研究。结果表明:长壁缓倾斜老采空区注浆充填方式可分为点柱式注浆、带状式注浆和全部注浆3种类型,并简要分析了各类注浆充填老采空区控制残余变形机理。提出了长壁老采空区点柱式注浆设计新方法,并通过理论研究给出了注浆柱尺寸和注浆孔间距设计原则;注浆孔首先应布置在采空区边界附近(注浆体扩散半径范围内),对采空区边界空洞和欠压密区进行注浆充填。 Old goaf grouting filling technology and methods for controlling the residual subsidence were studied based on analysis of the activation mechanism of old longwall goaf and part mining strata movement control theory. The results show that grouting filling for the old longwall goaf can be divided into the point pillar grouting,the strip grouting and the whole grouting three types. A new designed method of point pillar grouting for old longwall goaf was proposed. Furthermore,column size and hole spacing design principles of the point pillar grouting were proposed through the theoretical research. In order to grout and fill for boundary hollow and under-voltage dense area of the mined-out area,grouting hole should first be arranged in mined-out area( within the scope of diffusion radius of grouting body) near the border.
出处 《煤矿安全》 CAS 北大核心 2016年第10期85-88,92,共5页 Safety in Coal Mines
基金 安徽省博士后基金资助项目(2014B019) 矿山灾害预防控制省部共建国家重点实验室培育基地开放基金资助项目(MDPC2013KF14) 安徽理工大学博士基金资助项目(11096)
关键词 长壁老采空区 点柱式注浆 开采沉陷 残余变形 带状式注浆 old longwall goaf point-pillar grouting mining subsidence residual deformation strip grouting
  • 相关文献

参考文献7

二级参考文献36

共引文献85

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部