摘要 针对水电站群中长期发电计划编制的调度期末控制水位决策需求,建立以发电能力最大为目标的水电站群联合优化调度模型,并采用改进的逐次逼近与离散微分动态规划组合算法进行求解。以华电贵州区域乌江和北盘江两流域水电站群为例,采用2013年实际来水过程计算,通过与发电量最大、补偿效益最大等传统优化目标对比分析。结果表明:本文模型可根据各电站发电效率变化情况自动确定水库蓄放策略,实现水电站群调度期末控制水位及对应发电计划过程的同步优化,准确体现水电站群调度期内总发电量和调度期末总蓄能量的动态博弈关系。 In the light of the demand of water level decision in period end of scheduling of medium and long term power generation planning of hydropower station group, the paper established the joint optimal dispatching model which took the maximum power generation capacity as the target, and used improved combination dynamic programming algorithm of discrete differential and successive approximation to solve the model. It took the hydropower station group of Wujiang and Beipanjiang basin in Guizhou province for example, and using the actual inflow process in 2013, this model is compared with optimization objective of maximum power generation and compensation benefit. The result shows that the model can automatical- ly determine the scheduling strategy of reservoir according to the change of power generation efficiency of power station, and relized the synchronization optimization of water level decision of hydropower station group dispatching and corresponding generation planning . The model can accurately reflect the dynamic game relationship of total generating capacity in scheduling period and total energy storage at the end of scheduling period.
出处 《水资源与水工程学报》 2016年第4期174-178,183,共6页 Journal of Water Resources and Water Engineering
关键词 水电站群 中长期发电计划 优化调度 发电能力 hydropower station group medium and long term power generation plan optimal dispatching power generation capacity
  • 相关文献

参考文献9

二级参考文献176

共引文献205

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部