期刊文献+

金价对蛇屋山金矿最优开采路径影响研究

Research on Impacts of Golden Price on the Optimal Exploitation Path of Golden Mine in Shewu Mountain
下载PDF
导出
摘要 蛇屋山金矿亟需以动态和可持续发展的策略应对矿产资源量的不断消耗及国际金价的持续大幅波动。依据可耗竭资源理论,以矿山利润最大化为目标,建立蛇屋山开采路径研究的动态模型,通过分析确定模型中的各参数,对蛇屋山金矿的开采路径进行优化。并模拟分析不同价格下蛇屋山金矿的开采路径,从时间维度确定矿山年开采资源配置路径,进而从空间维度确定了不同区块的配置路径,由此确定出不同块段资源开采量,使金矿的开采达到最优。研究结果表明了该模型的有效性,模型可以得出矿山空白区资源的最优开采路径区块开发顺序,并可以预测随着资源市场价格的变动,矿山的经济可采储量,从而实现可耗竭资源合理有效的开发利用。 Gold mine of Shewu Mountain urgently need dynamic and sustainable development strategies to deal with the problems of mineral resource continuing consumption and the international gold price fluctuations. Basing on the theory of exhaustible resources,we aim to build a dynamic model of the Shewu Mountain to study the mining management,as well as maximize profits mine. Simulating of mining path with different ways, Shewu Mountain Gold resource allocation path can be determined from time dimension, and the configuration of a path can be determined from the spatial dimension blocks. As a result, the gold mining ore optimal can be decided from the amount of resource extraction different block segments. The results show the effectiveness of the model, and the model can draw the best path area development and exploitation of mining order blank area resources, and resources can be predicted with the changes in market prices, the mine's economically recoverable reserves, in order to achieve exhaustible rational and efficient development and utilization of resources.
出处 《国土资源科技管理》 2016年第5期105-110,共6页 Scientific and Technological Management of Land and Resources
基金 中国地质调查局项目(12120114056501)
关键词 可耗竭资源 动态模型 最优开采 开采路径 exhaustible resources dynamic models optimal extraction mining path
  • 相关文献

参考文献5

二级参考文献68

  • 1任一鑫,李英德,孙丕悦,宗科.资源回采率与费用关系研究[J].矿冶工程,2006,26(3):88-91. 被引量:4
  • 2G.C. Loury. The Optimal Exploitation of an Unknown Reserve [J]. Review of Economic Studies, 1978, 45 (141) :621--636.
  • 3R.J. Gilbert. Optimal Depletion of an Uncertain Stock [J]. Review of Economic Studies, 1979, 46(142) : 47-- 57.
  • 4R.S. Pindyck. Uncertainty and Exhaustible Resource Markets[J]. Journal of Political Economy, 1980,88 (6) : 1203--1225.
  • 5D. Martin & F.T. Sparrow. The Treatment of Uncertainty in Mineral Exploration and Exploitation[J]. Annals of Operations Research, 1985, (2) :271--284.
  • 6A. Epaulard & A. Pommeret. Optimally Eating a Stochastic Cake: a Recursive Utility Approach[J]. Resource and Energy Economies, 2003,25(2) : 129-- 139.
  • 7R.C. Kumar. How Long to Eat a Cake of Unknown Size? Optimal Time Horizon under Uncertainty[J]. Canadian Journal of Economics, 2002,35 (4) : 843 -- 853.
  • 8R.C. Kumar. How to Eat a Cake of Unknown Size.. A Reconsideration[J]. Journal of Environmental Economics and Management, 2005,50(2) :408--421.
  • 9J.A. Krautkraemer. The Cut--off Grade and the Theory of Extraction[J]. Canadian Journal of Economics, 1988,21(1) : 146--160.
  • 10T. Shinkuma &T. Nishiyama. The grade selection rule of the metal mines: an empirical study on copper mines [J]. Resources Policy, 2000,26(1):31--38.

共引文献41

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部