摘要
全地下污水处理厂结构空间布置复杂,需承受池内水荷载,且均为超长结构。在正定新区地下污水处理厂的设计中,确定了合理的结构内力分析方法,采取了结构及非结构措施保证箱体正常使用及耐久性。工程实际运行表明,结构设计合理,达到了预期目标。
The underground sewage treatment plants need to carry the internal water load and all have super-long structure, so the arrangement of the spatial structure is complicated. A reasonable struc- tural internal force analysis method was determined, and structural and nonstructural measures were taken to insure the normal operation and durability of the box body in the design of underground sewage treat- ment plant in Zhengding New District.
出处
《中国给水排水》
CAS
CSCD
北大核心
2016年第20期52-54,60,共4页
China Water & Wastewater
关键词
全地下污水处理厂
结构设计
全地下箱体
underground sewage treatment plant
structural design
underground box body