本文研究了2015年陕北姬塬油田长8目的层大斜度井实钻施工中存在的问题及对策。
This paper researches the problems existed during the actual drilling operation in high angle deviated wells of Chang 8 target reservoir in Jiyuan oilfield in 2015 and their countermeasures.
作者
吴农宣
周韬
Wu Nongxuan Zhou Tao(Changqing Drilling Company,Chuanqing Drilling Engineering Co., Ltd., X i’an 710018,China)
出处
《石化技术》
CAS
2016年第9期64-64,共1页
Petrochemical Industry Technology
关键词
大斜度井
靶前距
轨迹控制
high angle deviated well
frontal distance from target point
trajectory control