8Karmarkar U S. Lot Sizes, Lead Times and In-process Inventories [J]. Management Science, 1987, 33 (3): 409- 418.
9Zinovy D Radovilsky. A Quantitative Approach to Estimate the Size of the Time Buffer in the Theory of Constraints [J]. International Journal of Production Economics, 1998, 55 (2): 113-119.
10Zipkin P H. Models for Design and Control of Stochastic Multi-item Batch Production Systems [J]. Operations Research, 1983,34 ( 1 ):91-104.