水岸观溪住宅小区高层结构设计浅析

Elementary analysis of Shuianguanxi residential high-rise structure design
下载PDF
导出
摘要 结合某高层剪力墙结构住宅具体工程,通过PKPM软件试算,综合结构安全及用料经济等要求,优化剪力墙布置方案。针对该工程中出现的剪力墙连梁超筋问题,提出了采用双连梁或高连梁等解决方案。同时,进行了地下室顶板与底板的计算,在满足裂缝控制的要求下进行配筋,并进行桩基及承台布置。结果表明,剪力墙尽量上下对齐布置,能够发挥墙体刚度,提高抗剪承载力。 Combining an high-rise shear wall residential buildings project and the requirement of structural safety and saving material,the arranging measurement of shear wall had been optimized by using PKPM software for calculation. In allusion to the issue of over reinforcement in shear wall tie beam,the plan of using double tie beam or high tie beam construction measurement was proposed. At the same time,the calculation of the roof and floor of the basement was carried out,and the steel bar was carried out in order to meet the requirements of crack control,And carried on the pile foundation and the pile cap arrangement. The results showed that Shear wall up and down as far as possible alignment,will develop the wall rigidity,Increase shear capacity.
作者 李忠 LI Zhong(Fuzhou Architectural Design Institute, Fuzhou 350011)
出处 《福建建筑》 2016年第9期61-64,共4页 Fujian Architecture & Construction
关键词 剪力墙结构 双连梁 无梁楼盖 Shear wall structure Coupling beam Flat Slab
  • 相关文献

参考文献3

  • 1JGJ3-2010高层建筑混凝土结构技术规程[S].北京:中国建筑工业出版社,2011.
  • 2王涛.高层住宅剪力墙结构设计与研究[D].青岛:山东大学,2008,10(7):102-108.
  • 3吴东.高层剪力墙结构的设计与探讨[J].建筑设计学报,2009,15.

共引文献257

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部