期刊文献+

发电工程项目建设前期造价控制问题 被引量:5

Cost Control Problems in the Early Stage of Power Generation Project
下载PDF
导出
摘要 在工程建设中,造价前期控制可以说是非常重要的内容,对整个项目的造价控制具有十分关键的作用。而在很多工程实际建设当中,却并没有对该项内容做好充分的研究,并在后续建设中出现投资超出预期投资情况,在影响工程稳定建设的同时导致资金浪费现象的发生。本文基于发电工程建设特点,针对工程设计阶段和投资分析阶段采用投资估算方法进行造价控制,在项目建设的前期阶段开展造价管理,以获得更好的社会以及投资效益。 In the engineering construction, cost control in the early stage can be said to be a very important content, and play a very important role in the entire project cost control. But in the actual construction of many projects, it has not got sufficient research, which resulted in the subsequent investment in construction investment more than expected, affecting the stability of engineering construction and also bringing about a waste. Based on the characteristics of power construction project, the investment estimation method will be used to take the cost control in the engineering design stage and investment analysis stage, and the cost management will be carried out in the early stage of project construction, in order to obtain better social and investment benefits.
作者 李晨
出处 《价值工程》 2016年第31期73-75,共3页 Value Engineering
关键词 发电工程 项目建设 前期造价控制 power generation project project construction cost control in the early stage
  • 相关文献

参考文献5

二级参考文献15

共引文献11

同被引文献16

引证文献5

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部