金沙江下游通航问题解决思路 被引量:6

Solution for navigation problem in downstream waterway of Jinsha River
下载PDF
导出
摘要 从长江流域航道与航运的规划建设实践,论述流域航道建设的成就与经验。根据流域经济发展需求与水利水电建设现状,提出交通主管部门与水电开发建设部门合作共赢,研究解决金沙江下游700 km河段的航运问题。提出借鉴三峡枢纽工程的建设经验,在溪洛渡、白鹤滩和乌东德3座水利枢纽工程建设大型船闸或升船机,建设反调节梯级,适当提高水库防洪限制水位,解决水库变动回水区航道整治问题,实现金沙江下游全河段通航的建议。 The achievements and experience of the Yangtze River basin's waterway construction is expounded based on the practice of planning and construction. According to the demands of economic development and arrangement of hydro-power, this paper puts forward suggestions on achieving navigation of the downstream waterway of Jinsha River: taking the Three Gorges project's for reference to construct ship lock or ship lift in Xiluodu, Baihetan and Wudongde hydro-junctions, and construct reregulating reservoir and increase the flood control limited water level of the reservoir to deal with the channel regulation of the reservoir's fluctuating backwater area reservoir and realize navigation along the whole reach downstream Jinsha River.
作者 周玉华
出处 《水运工程》 北大核心 2016年第B10期94-97,115,共5页 Port & Waterway Engineering
关键词 金沙江下游 通航 水资源综合利用 船闸 升船机 反调节水库 downstream waterway of Jinsha river navigation comprehensive utilization of water resources ship lock ship lift reregulating reservoir
  • 相关文献

参考文献1

二级参考文献7

  • 1交通部.长江水系、淮河水系、京杭运河航道技术等级评定[R].北京:交通部,1998.
  • 2张沛文,朱贵祥.山区河流航道滩险整治水力计算探讨[R].北京:中交水运规戈!艘计烷,1975.
  • 3交通部运河局.京杭运河航道设计几项暂行规定[R].北京:交通部,1959.
  • 4蒋忠绥.平原河流浅滩整治线宽度计算理论与方法.水运工程,1979,(4):57-64.
  • 5张春贤.合力建设黄金水道,促进长江经济发展[N].中国交通报,2006-01-24(1).
  • 6杨锦华.长江中下游浅滩航道整治水位和整治线宽度的确定[J].水运工程,1990(2):27-35. 被引量:4
  • 7乐培九,李旺生.冲积河流航道整治线宽度问题的研究[J].水运工程,1991(5):21-26. 被引量:3

共引文献6

同被引文献35

引证文献6

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部