摘要
大型围填海工程前期策划是集市场需求、工程立项审批、项目建设、环境保护、运营管理和效益评估等众多专业学科为一体的系统分析论证工作。以东莞长安新区围填海大型工程前期工作为例,从项目运作实际需求出发,梳理海洋部门管理政策和审批流程,提出在产业策划、城市规划、项目申报、立项报批、管理模式和生态化海岸规划等项目前期工作全流程运作层面的策划思路和推进路线,总结长安新区围填海工程前期工作的实操经验,探讨提升水运设计咨询单位一体化解决大型围填海工程前期工作问题能力的路径和方法。
Large-scale reclamation project pre-planning is a systematic analysis and demonstration of many professional disciplines, including market demand, project approval, project construction, environmental protection, operation management, benefit evaluation, etc.Taking the large-scale reclamation project pre-planning in Chang'an new district of Dongguan as a study case, we consider first the actual needs of the project operation and analyze the management policy and approval process of the marine administrative department, and propose the planning idea and promoting means in the early-stage work of the whole process for the industrial planning, urban planning, project reporting, project approval, management mode and ecological coastal planning, etc., summarize the experience of early-stage land reclamation engineering practice of Chang'an new district, and probe into integrated solutions for problems in the early-stage land reclamation engineering.
作者
张鹏
黄威
段春艳
钱立明
ZHANG Peng HUANG Wei DUAN Chun-yan QIAN Li-ming(CCCC Water Transportation Consultants Co., Ltd., Beijing 100007, China)
出处
《水运工程》
北大核心
2016年第10期34-39,共6页
Port & Waterway Engineering
关键词
一体化
围填海
前期策划
系统策划
integrated
land reclamation
pre-planning
systematic planning