摘要
按照国内港口工程规范工程水位计算的要求,需要使用长短期实测水位资料。而海外工程项目实测数据匮乏,资料深度不满足工程水位的计算要求。以埃及苏赫纳项目为依托,对港口工程水位进行计算,阐明国内外港口工程水位计算方法的异同。
According to the requirement on water level calculation stipulated in Chinese code for port engineering, the long-term & short-term real-measured water level are needed. Due to the lack of observation data for overseas projects, design water levels can not meet the requirements of Chinese Code. Based on Ain Sukhna project in Egypt, we calculate the water level of port engineering, and expound clearly the similarities and differences of calculation methods for the water level at home and abroad.
作者
周剑
施凌
唐敏
ZHOU Jian SHI Ling TANG Min(CCCC Water Transportation Consultants Co., Ltd., Beijing 100007, China)
出处
《水运工程》
北大核心
2016年第10期106-109,113,共5页
Port & Waterway Engineering