广电机房搬迁实施方案研究 被引量:5

Research on the implementation scheme of the relocation of radio and television computer room
下载PDF
导出
摘要 随着业务的发展,设备的增加和机房承载业务功能逐步多样化和复杂化,原来的机房已经不能适应目前的需求。新广电大楼的建设完工,机房搬迁迫在眉睫。机房搬迁主要涉及新机房的装修、供配电系统建设、接地防雷系统建设、消防系统建设、光缆线路割接、传输设备搬迁及安装调试等方面。 With the development of business, increased equipment and room carrying business functions are gradually diversified and complex, and the original room has been unable to meet the current demand. With the completion of the construction of new radio and television building, room relocation is imminent. Room relocation involves new room's decoration, power supply and distribution system, grounding lightning protection system, the construction of fire protection system, cutover of optical cable line, relocation of transmission equipment and installation and other aspects.
作者 彭学山 Peng Xueshan(Yangbi Branch of Yunnan Radio and Television Network, Dali 672500, Chin)
出处 《无线互联科技》 2016年第19期108-110,共3页 Wireless Internet Technology
关键词 广电网络 机房搬迁 供配电系统 radio and television network computer room relocation power supply and distribution system
  • 相关文献

参考文献3

共引文献1

同被引文献12

引证文献5

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部