5DENG T J,HE H Z. Deviation Analysis of Earthwork Calculated by Square Grid Method[A].UK:World Academic Union,2008.594-600.
6AL-JIBOURI S H,MAWDESLEY M J,ASKEW B H. A Computer System for Modeling the Process of Earthwork Planning in Linear Construction Projects[J].{H}INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY,2004,(1/2/3):90-101.
7BURAK G A,HILMI L A. Method for Balancing Cut-Fill and Minimizing the Amount of Earthwork in the Geometric Design of Highways[J].Journal of Transportation Engineering,2003,(05):564-571.doi:10.1061/(ASCE)0733-947X(2003)129:5(564).
8HARMANANI H M,ZOUEIN P P,HAJAR A M. A Parallel Genetic Algorithm for the Geometrically Constrained Site Layout Problem With Unequal size Facilities[J].International Journal of Computational Intelligence & Application,2004,(04):375-400.