期刊文献+

高含水油田开发方案调整数值模拟研究 被引量:2

Numerical Simulation Study on Development Plan Adjustment for Oil Field with High Water Cut
下载PDF
导出
摘要 别古庄油田京11断块从1979年投入开发截至到2014年12月采出程度达到50.97%,综合含水达到90.6%,已经进入高含水开发后期。为了搞清油藏剩余油分布并进行化学驱试验,提高采收率和经济效益,对该油藏进行了开发数值模拟研究。通过采用Eclipse黑油模型,结合地质分析和油藏工程评价,在产油量、含水率和地层压力等历史拟合的基础上,针对化学驱设计了3套不同的调整开发方案,并对其开发指标进行了预测。通过预测结果分析,建议采用各项开发指标为最佳的调整方案,为合理开发京11断块油藏提供了依据。 The recovery degree of north China Beijing 11 fault block reaches to 50. 97% from 1979 at which of development until December of2014,comprehensive water cut is 90. 6%,and it has entered into high water-cut development period. In order to find out reservoir remaining oil distribution and carry out chemical flooding experiment,improve the recovery efficiency and economic benefits,the reservoir numerical simulation study has been developed. Through the adoption of Eclipse black oil model and combining with geological analysis and reservoir engineering evaluation,on the basis of history matching of the oil content,moisture content and formation pressure,3 different sets of adjustment plans for chemical flooding are designed,and its development index is forecasted. Through the analysis of prediction results,it is recommended that the best adjustment scheme using every development indicators provides the basis for rational development of oil reservoir at Jing 11 fault block.
出处 《油气井测试》 2016年第5期5-8,共4页 Well Testing
基金 中国石油天然气股份公司重大科技专项"华北油田上产稳产800万吨关键技术研究与应用"(2014E-35-07) "天津市企业博士后创新项目择优资助计划资助"项目内容
关键词 高含水 数值模拟 历史拟合 采收率 方案调整 high water cut numerical simulation history matching recovery factor plan adjustment
  • 相关文献

参考文献3

二级参考文献17

共引文献59

同被引文献43

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部