摘要 钒钛矿冶炼高炉利用系数提高后,高炉炉前出铁成为限制因素。介绍了高炉炉前开口机挡板的使用现状,针对开口机钻杆与挡板之间由于摩擦和震动造成的孔洞熔蚀问题,设计了一种新型开口机挡板。新型挡板结构简单、制作成本低、维护方便,提高了开口机挡板的使用寿命。 With the utilization coefficient of vanadium - titanium ore smelting blast furnace getting raised, the tapping stage becomes the limit factor for the blast furnace. The operation situation of stopping plate of nozzle - tapping machine of blast furnace is introduced. To solve the problem of hole erosion of the plate caused by friction and vibration between drill pipe and the plate, a kind of new - type nozzle - tapping machine stopping plate is designed. It has advantages of simple structure, low making cost and convenient maintenance, and has longer work life.
作者 李伊辉 陈树军 吕庆 Li Yihui Chen Shujun Lv Qing(Metallurgy and Energy Resource Institute, North China University of Science and Engineering, Tang shan,Hebei, 063009 Iron Making Department, Hesteel Group Chengsteel Company, Chengde, Hebei, 067002)
出处 《河北冶金》 2016年第10期5-7,共3页 Hebei Metallurgy
关键词 钒钛矿冶炼高炉 出铁 开口机 优化 研究 vanadium - titanium ore smelting blast furnace iron tapping nozzle - tapping machine optimi-zation research
  • 相关文献

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部