摘要 结合二滩水电站近年来枯水期典型月份的实际运行状况和运行数据与前一年的数据进行类比分析,通过简单的算术计算,说明水电站在机组运行方式和厂用电运行方式上可以进行优化;重点对枯水期机组实际运行方式进行了经济性和可行性分析,通过电网负荷变化的特点和电网接线方式以及备用容量规定的要求,优化了机组的运行方式。 The practical monthly operation conditions and operation data of the Ertan Hydropower Station in low water season are compared and analyzed. It shows that the operation modes of the generator units and the station service power could be further optimized. The economics and feasibility of the unit practical operation mode in the low water season are analyzed. Considering the load changes and connection mode of the power grid,and the requirement of the standby capacity,the unit operation mode is optimized.
作者 甘成勇 史宝平 王伦 梁浩 刘和咏 GAN Chengyong SHI Baoping WANG Lun LIANG Hao LIU Heyong(Ertan Hydropower Plant, Yanbian 610051, China)
机构地区 二滩水力发电厂
出处 《水电与新能源》 2016年第10期4-7,共4页 Hydropower and New Energy
关键词 二滩水电站 机组运行方式 厂用电运行方式 经济性 可行性 Ertan Hydropower Station unit operation mode operation mode of the station service power economics feasibility
  • 相关文献

参考文献3

二级参考文献3

共引文献6

同被引文献5

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部