期刊文献+

基于BIM的工程建设项目业主方的风险研究 被引量:7

Risk of Proprietor in Construction Projects Based on BIM
下载PDF
导出
摘要 BIM应用是我国建筑企业未来提高自身竞争力的重要手段,但是BIM在国内的应用起步较晚,还不够成熟,BIM应用的管控机制也不够完善和统一.本文在BIM应用的基础上,对BIM下业主方风险因素进行识别,并对相关的风险因素展开分析,提出了风险应对的防范措施,为业主在建设项目中选择BIM应用提供决策参考. BIM application is an important means of China' s construction enterprises to improvetheir future competi- tiveness, but the application of BIM in domestic started late, still not mature enough, the application of BIM control mechanismsare not perfect and unified. In this paper, based on the application of BIM, identify the risk factors of proprietor and analyze the related risk factors, put forward theprecautionarymeasures to risk response, and provide decision -making referencefor proprietor in construction projects to choose BIM application.
出处 《吉林建筑大学学报》 2016年第5期97-100,共4页 Journal of Jilin Jianzhu University
关键词 BIM 建设项目 业主方 风险 BIM construction project proprietor risk
  • 相关文献

参考文献4

二级参考文献24

  • 1张建平,曹铭,张洋.基于IFC标准和工程信息模型的建筑施工4D管理系统[J].工程力学,2005,22(S1):220-227. 被引量:108
  • 2朱禄娟.国际工程项目交付方式的启示[J].建筑经济,2006,27(2):64-67. 被引量:2
  • 3王永军,董平.企业动态联盟决策支持系统研究[J].北京理工大学学报(社会科学版),2006,8(2):3-6. 被引量:2
  • 4魏光兴,余乐安,汪寿阳,黎建强.基于协同效应的团队合作激励因素研究[J].系统工程理论与实践,2007,27(1):1-9. 被引量:38
  • 5Feniosky Pe a-Mora,Michael Li. Dynamic planning andcontrol methodology for design/build fast-trackconstruction projects[J] . Journal of ConstructionEngineering and Management, 2001, 127 ( 1 ): 1-17.
  • 6David C. Kent, Burcin Becerik-Gerber. UnderstandingConstruction Industry Experience and Attitudes towardIntegrated Project DeliveryfJ]. Journal of ConstructionEngineering and Management, 2010 ( 8 ): 815-824.
  • 7AIA Nation/AIA California Council* Integrated projectdelivery : a guide [M/OL] * Washington : The AmericanInstitute of Architects,2007.
  • 8Seongkyun Cho,Glenn Ballard . Last planner andintegrated project delivery[J]. Lean Construction Journal,2011, 2011: 67-78.
  • 9The Construction Management Association of America(CMAA ). Managing Integrated Project Delivery[EB/OL]. http: //cmaanet.org/. (2010-10) [2011-5-28].
  • 10Sdongkyun cho and Glenn Ballard ( 2011 ) Last Plannerand Integrated Project Delivery Lean Construction Journal2011,67-68-Lean and Integrated Project Delivery Specialissue[EB/OL]. http: //www. leanconstructionjoumal.org/.

共引文献686

同被引文献31

引证文献7

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部