期刊文献+

考虑CBL误差不确定性的PJM电力市场经济需求响应模型研究 被引量:1

Economic Demand Response Modeling in PJM Electric Market Considering CBL Error Uncertainty
原文传递
导出
摘要 PJM(Pennsylvania-New Jersey-Maryland)电力市场中经济需求响应(economic demand response,EDR)虽已经实施得比较成功,但同时也存在着一定问题。针对PJM电力市场中近年来发生的Electric Power Supply Association(EPSA)决议风波所暴露出来的各方利益不均衡等问题,提出在原有PJM电力批发市场中,使发电商也参与到EDR的交易中,采用负荷转移与负荷削减模式共存的EDR代替原先单一负荷削减模式下的EDR。同时在构建EDR模型时,考虑用户基线负荷(customer baseline load,CBL)误差不确定性的因素,以准确地计算EDR的真实响应误差。案例分析结果表明:考虑CBL误差能估计出需求响应误差的真实成本;而负荷转移模式能够一定程度上协调发电商、负荷服务商实体(load serving entities,LSE)和削减服务提供商(curtailment service providers,CSP)之间的利益。 Though the economic demand response( EDR) in PJM( Pennsylvania-New Jersey-Maryland) electric market has implemented successfully,there are still some problems. According to the problems in recent years disclosed by ESPA Decision such as unbalanced interests,this paper propose a new EDR with the co-existence model of load shifting and load curtailment instead of the original EDR with only load curtailment mode,so that generators can also join the EDR in PJM electric market. Meanwhile,this paper considers the error uncertainty of customer baseline load( CBL) to accurately calculate the true response error of EDR when constructing the EDR model. The results of the case study show that taking CBL error into consideration can estimate the real cost of EDR error and the load shifting mode can coordinate the interests of generators,load service entities( LSE) and curtailment service providers( CSP) to a certain extent.
出处 《电力建设》 北大核心 2016年第10期137-143,共7页 Electric Power Construction
基金 国家自然科学基金项目(51577071) 广东省自然科学项目(2015A030313202)~~
关键词 经济需求响应 用户基线负荷 PJM 平衡运行备用费用 不确定性 economic demand response customer baseline load PJM balance operating reserve fee uncertainty
  • 相关文献

参考文献21

二级参考文献104

共引文献257

同被引文献11

引证文献1

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部