期刊文献+

斜向大跨度钢桁架递进式滑移施工技术 被引量:1

PROGRESSIVE SLIDING CONSTRUCTION TECHNOLOGY OF OBLIQUE LONG-SPAN STEEL TRUSS
下载PDF
导出
摘要 北京龙湖时代天街项目钢桁架跨度为38 m,跨度方向高低差为5.35 m,单榀桁架长41.8 m,现场塔吊起重能力有限,无法使用大型吊装设备。分析了在有限施工条件下的钢桁架滑移施工技术,从而解决塔吊起重能力有限和现场无法使用大型吊装设备的问题,并有效地控制了钢桁架安装过程中的安全、质量、进度和成本。 The span of the steel truss of Beijing Longfor Times Paradise Walk projects is 38 meters,and the height difference is 5. 35 m in the span direction,the length of single truss is 41. 8 m. Because the tower crane lifting capacity is limited,large lifting equipment cannot be used in the construction. The sliding construction technology of steel truss under the limited construction condition was introduced,so as to solve the problems such as the lifting capacity is limited and the large hoisting equipment cannot be used in the field,and effectively control the safety,quality,progress and cost in the process of steel truss installation.
出处 《钢结构》 北大核心 2016年第10期88-92,共5页 Steel Construction
关键词 斜向 高低差 大跨度 钢桁架 滑移 oblique height difference long-span steel truss sliding
  • 相关文献

参考文献3

  • 1GB50017--2003.钢结构设计规范[S].[S].,..
  • 2JGJ7-2010空间网格结构技术规程[S].
  • 3GB50205--2001,钢结构工程施工质量验收规范[S].

共引文献257

同被引文献10

引证文献1

二级引证文献2