摘要
龙固煤矿中央泵房埋深-855 m,围岩变形大、支护风险高。为解决中央泵房硐室围岩的支护难题,基于先"柔"后"刚"的模式提出了锚网索喷让压+锚注联合支护方案,并分别通过理论分析和数值模拟对泵房围岩注浆效果进行了研究,取得了较好的围岩加固效果。
The Longgu mine central pump room is -855m in buried depth, which faces with the problem of large deformation of surrounding rock and supporting difficulty. In order to solve the difficulty problem of surrounding rock control in the central pump room, the combined support scheme of bolt-mesh-anchor - pressure relief + bolt-grout have been put forward based on the model of "flexible" and "rigid", and studied respectively by theoretical analysis and numerical simulation of wall rock grouting effect,which obtain good effect of surrounding rock reinforcement.
出处
《煤炭技术》
CAS
北大核心
2016年第11期153-155,共3页
Coal Technology
基金
国家自然科学基金资助项目(51379119)
山东科技大学矿山灾害预防控制省部共建国家重点实验室培育基地开放课题基金项目(MDPC2013ZR03)
山东科技大学人才引进科研启动基金项目(2014RCJJ027)
关键词
锚注支护
中央泵房
围岩控制
bolt-grouting support
central pump room
surrounding rock control