摘要 针对连续降雨导致的尾矿库失稳溃决,基于饱和-非饱和渗流理论和水砂混合物非平衡连续方程和动量方程,建立了一个尾矿库边坡失稳溃坝数学模型。该模型可考虑连续降雨条件下尾矿库的渗流场和应力场变化、溃口和底床变化对溃坝下泄物流量过程影响。应用该模型对某尾矿库进行了连续降雨条件下失稳溃坝过程的模拟分析,计算结果表明:连续降雨入渗使尾矿库浸润线不断抬升,进而导致尾矿库边坡发生失稳,失稳后坝体受力条件急剧恶化,在上游荷载作用下发生剪切破坏导致漫顶溃决。 Focused on the tailings dam breaching caused by continuous rainfall,and based on the saturated-unsaturated seepage theory,the non-equilibrium continuous equation and the momentum equation of water-sand mixture a mathematical model is put forward to describe the tailings dam breaching due to slope failure. The model considers the impact on drainage flow process of tailings dam due to the change of seepage and stress field,as well as the variation of breach slope and bed.Meanwhile,the model is applied to simulate the dam breaching process of a tailings dam under continuous rainfall,and the calculated results show that continuous rainfall infiltration makes seepage line of the dam constantly rising,and then leads to dam slope failure; The stress condition of dam body deteriorates rapidly after the collapse of slope,and the shear failure of the remaining wedge may occur under the action of upstream loads,after that the overtopping failure occurs.
出处 《金属矿山》 CAS 北大核心 2016年第10期165-170,共6页 Metal Mine
基金 国家自然科学基金项目(编号:51539006 51379130 51379129)
关键词 尾矿库 连续降雨 滑坡失稳 漫顶溃决 数值模拟 Tailings dam Continuous rainfall Slope instability Overtopping failure Numerical simulation
  • 相关文献

参考文献16

  • 1AQ2006-2005尾矿库安全技术规程[S].2005.
  • 2Slade N, Kuyucak N. Tailings thickening to reduce impacts on water resources[ J]. International Mining,2009(2) :353-359.
  • 3梅国栋,王云海.我国尾矿库事故统计分析与对策研究[J].中国安全生产科学技术,2010,6(3):211-213. 被引量:68
  • 4徐志英,沈珠江.高尾矿坝的地震液化和稳定分析[J].岩土工程学报,1981,3(4):22-32.
  • 5Rico M, Benito G, D'lez-Herrero A. Floods from railings dam fail- ures[ J]. Journal of Hazardous Materials ,2008,154( 1 ) :79-87.
  • 6Pastor M, Quecedo M, Merodo J F, et al. Modelling tailings dams and mine waste dumps failures [ J ]. Geotechnique. 2002,52 ( 8 ) : 579- 591.
  • 7王洁,刘永,张志军,桂荣.降雨入渗对尾矿坝稳定性的影响[J].南华大学学报(自然科学版),2014,28(1):24-28. 被引量:6
  • 8孙恩吉,张兴凯,李仲学,裴玉斌.降雨条件下尾矿坝饱和-半饱和渗流模拟分析[J].中国安全生产科学技术,2012,8(3):5-8. 被引量:11
  • 9Zhang R J, Xie J H. Sedimentation Research in China, Systematic Selections [ M ]. Beijing: Water and Power Press, 1993 : 183-201.
  • 10Richardson J F, Zaki W N. Sedimentation and fluidization: Part I [ J]. Trans Inst Chem Eng, 1954,321:35-53.

二级参考文献37

共引文献103

同被引文献104

引证文献10

二级引证文献64

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部