通过对四川凯力威科技股份有限公司实际在用的一台内衬层外复合挤出压延生产线运行中生产速度控制、卷取温度工艺指标不达标等问题进行分析,提出并具体实施了的改造措施进行总结,并探讨实际运行中通过控制生产线速度和增加冷却制冷量控制卷取温度的措施。
Through of Sichuan Kalevei technology Co.,LTD. actual used a lining layer in composite extrusion calendering production line operation in production speed control, coiling temperature process indicators are not compliance issues analysis proposed and specific implementation of the reform measures are summarized, and discuss the actual operation by controlling the speed of the production line and increase the cooling capacity of the cooling control volume temperature measures.
作者
吴迪
刘纯忠
刘寒
Wu Di Liu Chunzhong Liu Han(Sichuan Kalevei Technology Co.LTD., Jianyang 641400, Sichuan, China)
出处
《橡塑技术与装备》
CAS
2016年第21期41-44,共4页
China Rubber/Plastics Technology and Equipment
关键词
内衬层生产线
冷却系统
生产线速度控制
卷取温度
lining layer production line
cooling system
production line speed control
coiling temperature