期刊文献+

浅谈长江南京段堤防管理信息化的建设 被引量:1

Brief discussion on construction of embankment management informatization in Nanjing section of Yangtze River
下载PDF
导出
摘要 基于长江南京段管理人员由于岸线长、环境恶劣、人员配备不足等原因不能及时了解辖区内沿线堤防突发状况的现状,笔者从多方面、多角度阐述了长江南京段堤防管理信息化建设的背景,提出了长江南京段堤防管理信息化建设的意义及内容,分析了建设过程中可能存在的问题,为长江南京段堤防管理信息化的建设作出了一些探索性的思考。 Due to the current situation of long shore line, bad environment, and insufficient staffs, administrators in Nanjing section of Yangtze River are unable to get aware of embankment emergencies in managed areas in time, We elaborate on the background of embankment management informatization construction in Nanjing section of Yangtze River in multiple aspects, multiple viewpoints. The potential problems during construction are analyzed. Exploratory thoughts on construction on of embankment management informatization in Nanjing section of Yangtze River are discussed.
作者 蒋本虎 李恺 徐刘诚 JIANG Benhu LI Kai XU Liucheng(Yangtze River Management Office ofNanjing, Nanjing 210011, Jiangsu)
出处 《江苏水利》 2016年第4期47-49,55,共4页 Jiangsu Water Resources
关键词 南京 长江堤防 堤防管理 信息化 Nanjing Yantze River embankment embankment management informatization
  • 相关文献

参考文献4

二级参考文献12

共引文献28

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部