浅谈圆角梯形滚水堰施工技术

Discussion on the construction technology of rounded trapezoidal overflow weir
下载PDF
导出
摘要 泗阳节制闸除险加固工程新建节制闸7孔,每孔均设置圆角梯形滚水堰。滚水堰既是高速水流过水部位,又是冲磨较严重区域,施工立模精度和混凝土质量要求比较高。本文结合泗阳闸滚水堰一次施工成型的工程实践,对其在模板选用和制作安装、钢筋制作安装、混凝土配合比设计、温差裂缝控制等各个环节的施工技术作了重点介绍。经技术创新和施工实践,圆角梯形滚水堰的堰型和质量得到了有效控制。 Seven sluices are built in reinforcement project of Siyang sluice. There is rounded trapezoidal overflow weir in every sluice. Overflow weir is not only the high-speed overflow part, but also a serious abrasion region. The accuracy of construction formwork and concrete quality requirements are relatively high. Combined with the one time molding engineering practice of Siyang sluice overflow weir, all aspects of the construction technology were introduced. Such as template selection, fabrication and installation, steel fabrication and installation, concrete mixture proportion design and temperature cracking control. By technical innovation and construction practice, the quality of rounded trapezoidal overflow weir has been effectively controlled.
作者 陈亚娟 顾永明 CHEN Yajuan GU Yongming(Jiangsu Water Conservancy Construction Engineering Co., Ltd., Yangzhou 225002, Jiangs)
出处 《江苏水利》 2016年第5期30-32,38,共4页 Jiangsu Water Resources
关键词 南水北调 滚水堰 一次成型 配合比 south-to-north water diversion overflow weir one time molding mix proportion
  • 相关文献

参考文献5

二级参考文献2

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部