南通市九圩港提水泵站工程深基坑开挖及降水施工分析与探讨 被引量:2

Analysis and discussion on deep foundation pit excavation and dewatering construction of Jiuweigang pumping station project in Nantong
下载PDF
导出
摘要 本文从南通市九圩港提水泵站工程主体深基坑的开挖及降水设计与施工、对周边建筑物产生的影响、采取的措施等方面进行了较为详细的阐述。特别是对深基坑开挖截渗墙设计方案的比较、基坑开挖及降水过程中出现问题后采取的应对措施等方面进行了阐述。并对深基坑施工的整个过程作了总结与思考,对类似深基坑的施工有一定的借鉴意义。 Deep foundation pit excavation and dewatering design and construction,effects on the surrounding buildings,measures of the main part of Nantong Jiuxugang pumping station project are expounded in details. In particular the comparison of the design scheme of the cutoff wall for deep foundation pit excavation and the measures taken after the problem occurred in foundation pit excavation and dewatering are expounded. Summary and thinking for the whole process of deep foundation pit construction is made,which provide certain reference for similar construction of deep foundation pit.
作者 杨卫星 江季忠 YANG Weixing JIANG Jizhong(Nantong Jiuweigang Sluice Management Station, Nantong 226003, Jiangs)
出处 《江苏水利》 2016年第7期5-9,共5页 Jiangsu Water Resources
关键词 地基 真空预压 排水固结 试验 foundation vacuum preloading drainage consolidation experiment
  • 相关文献

参考文献4

  • 1江苏省工程勘测研究院有限责任公司.南通市九圩港提水泵站工程地质勘察报告(施工图阶段)[R].扬州:江苏省工程勘测研究院有限责任公司,2014.
  • 2江苏省水利勘测设计研究院有限公司.南通市九圩港提水泵站工程初步设计报告[R].扬州:江苏省水利勘测设计研究院有限公司,2014.
  • 3江苏省水利建设工程有限公司.南通市九圩港泵站工程基坑降水及开挖专项施工方案[R].扬州:江苏省水利建设工程有限公司,2015.
  • 4南通市江海测绘院有限公司.南通市九圩港闸西侧变形测量报告[R].南通:南通市江海测绘院有限公司,2015.8-20164.

同被引文献9

引证文献2

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部