期刊文献+

那邦水电站引水隧洞渗流分析

Seepage Analysis of Headrace Tunnel of Nabang Hydropower Station Project
下载PDF
导出
摘要 在分析那邦水电站引水隧洞水文地质条件的基础上,根据实测渗流量,以代表剖面反算得到围岩的平均渗透系数。各工况渗流场计算分析表明,Ⅲ类围岩洞段在没有衬砌的条件下,地下水位线不会因外水内渗而明显降低,发电流量不会因内水外渗产生较大损失,渗流量和围岩渗流梯度均处于可接受的范围内,为取消Ⅲ类围岩洞段衬砌提供了依据。 According to in-situ seepage quantity measurement, the average permeability of surrounding rock is got by inversing the seepage data of typical cross sections of long headrace tunnel in Nabang Hydropower Station project based on hydrogeological condition analysis. The calculation results of seepage field in different operation conditions indicate that, for tunnel sections with Class-Ⅲ surrounding rock, the underground water level will not have a obvious lower and the diversion flow will not have a greater loss as seepage water from surrounding rock to tunnel or tunnel to surrounding rock when no lining in tunnel. The seepage quantity and the seepage gradient of surrounding rock are within acceptable range, which support to cancel the linings of tunnel sections in Class-Ⅲ surrounding rock area.
出处 《水力发电》 北大核心 2016年第11期47-49,61,共4页 Water Power
关键词 引水隧洞 渗流 地下水位线 流量损失 那邦水电站 headrace tunnel seepage underground water level water loss Nabang Hydropower Station
  • 相关文献

参考文献5

二级参考文献7

  • 1杜延龄,许国安.反求水文地质参数的方法[J].水利水电技术,1994,25(2):30-34. 被引量:2
  • 2朱伯芳.有限单元法原理及应用[M].北京:中图水利水电出版社,1998..
  • 3陕西省地质局区测队宝鸡幅地质图1:20万.西安,1959.
  • 4陕西省地质局第一水文地质队陕西省太白盆地水文地质勘察报告1:10万,1980.
  • 5陕西省水利电力勘测设计研究院地质勘察总队引红济石调水工程地质勘察报告.咸阳.2004.
  • 6顾慰慈.中国建材工业出版社渗流计算原理及应用.北京,2000.
  • 7王炜等.长安大学勘测设计研究院.引红济石工程隧洞用水量计算,2005-06.

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部