摘要
研究目的:本文针对丹大线信号工程设计中存在的一些技术难点,对区间路基地段综合接地、道岔缺口信息远程视频监测、与C3衔接站和非纯客运站应答器设置、金州站调度指挥方案等问题,分析多种方案的可行性,并提出最终解决方案。研究结论:(1)区间路基地段采用贯通地线坡脚直埋方式可满足本工程多数情况下的接地电阻要求;(2)使用道岔缺口监测系统单独组网的方案可解决远程实时视频监测的问题;(3)与C3衔接站C2和C3应答器设置方式应相互兼容;(4)非纯客运站应答器设置应满足运输需求;(5)金州站根据运输需求应具备调度所和站调楼的不同集中控制模式;(6)本研究成果可为其他新建时速200 km客货共线铁路和类似铁路的设计提供一定借鉴。
Research purposes: This paper focuses on difficulties in Dandong - Dalian railway signal engineering design, including integrated grounding at subgrade sections outside stations, remote video monitoring of switch gaps, setting at link stations to C3 sections and not- only- passenger stations, and dispatching design of Jinzhou analyzes the feasibilities of various programs, and proposes the ultimate solution. balises station, could conform to requirements of ground resistance mostly. (2) Switch gap video monitoring system networking independently could make the remote monitoring real - time. (3) Balises setting mode of C2 and C3 at link stations to C3 sections should be compatible with each other. (4) Balises setting at not- only -passenger stations should satisfy requirements of transport. (5) Jinzhou station should have different centralized control mode of railway bureau or station, depending on requirements of transport. (6) The research result can provide reference for other similar railway project.
出处
《铁道工程学报》
EI
北大核心
2016年第10期102-105,115,共5页
Journal of Railway Engineering Society
关键词
丹大线
综合接地
道岔缺口监测
应答器
集中控制
Dandong- Dalian railway
integrated grounding
switch gap monitoring
balise
centralized control