期刊文献+

锡铁山铅锌矿副井提升系统改造 被引量:1

Technical Renovation for Hoisting System of Auxiliary Shaft in Xitieshan Lead-zinc Mine
原文传递
导出
摘要 为了缓解锡铁山铅锌矿斜坡道的运输压力,矿方决定改造现有副井提升系统,使其提升能力达到600~800kt/a。根据副井运行现状,分析提出了3种技术可行的改造方案,通过技术经济优缺点综合比较,确定轻型罐笼配3m^3非标侧卸式矿车为最佳改造方案,为矿山实施副井提升系统改造提供了技术指导。 In order to alleviate the pressure of ramp transportation in Xitieshan lead-zinc mine, the existing hoisting system of auxiliary shaft was planned for renovation, so as to enhance the hoisting capacity to 600-800 kt/a. According to the present operation status of the auxiliary shaft, three technologic feasible renovation schemes were proposed. By comprehensive comparison of technical and economic advantages and disadvantages, the optimum scheme was determined to use Light-duty Cage with 3 ms non-standard side tipping wagon. This solution provided technical guidance for the mine hoisting system of auxiliary shaft transformation.
出处 《矿业研究与开发》 CAS 北大核心 2016年第10期124-126,共3页 Mining Research and Development
关键词 竖井 提升系统 技术改造 提升能力 Auxiliary shaft, Hoisting system, Technical renovation, Hoisting capability
  • 相关文献

参考文献8

二级参考文献24

  • 1周继泽.提升罐笼阻车器改进的实践[J].黄金科学技术,2004,12(4):42-44. 被引量:4
  • 2朱永刚,张钦礼,王新民.矿井竖井提升系统安全事故的事故树分析及安全管理[J].采矿技术,2005,5(4):106-108. 被引量:10
  • 3白晓平,才庆祥.多因素生产分析决策模型及在矿山提升系统中的应用[J].化工矿物与加工,2006,35(6):25-27. 被引量:1
  • 4矿井提升机故障处理和技术改造编委会.矿井提升机故障处理和技术改造[M].北京:机械工业出版社,2005..
  • 5龚声武,李夕兵,杜坤,等.基于层次分析的竖井提升系统熵模糊评价[C]//2010中国矿山安全管理与技术装备大会论文集,2010:90-95,113.
  • 6<采矿设计手册>编委会.采矿设计手册(4):矿山机械卷[M]北京:中国建筑工业出版社,1988.
  • 7国家安全生产监督管理局;国家煤矿安全监察局.煤矿安全规程[M]北京:中国法制出版社,2011.
  • 8李晓飞;薛剑光.《金属非金属矿山安全规程》解读[M]武汉:长江文艺出版社,2006.
  • 9北京有色冶金设计院;鞍山黑色金属矿山设计院.金属矿山采矿设备设计[M]北京:冶金工业出版社,1977.
  • 10中华人民共和国机械工业部.JB/T 6754.2-1993直流传动矿井提升机电控设备第二部分 晶闸管电控设备[s]2-1993直流传动矿井提升机电控设备第二部分 晶闸管电控设备[K].北京:机械科学研究院,1993.

共引文献14