摘要 某热轧精轧机装备早期的纯电动压下机构,在线调整能力低响应慢,压下位置的检测方式也存在很多问题,无法满足产品厚度精度的要求。针对其存在问题进行了分析并提出了解决方案,使其压下机构的调整精度和效果达到了预期的目标。 One finishing mill of hot strip mill installed the early stage electric screw-down device,which has low capability for online adjustment and slow response,and also many problems for measuring methods to screwdown position,thus the precision of products thickness could not be fulfilled. This paper has made analysis on the existed problems and proposed a solution in order to enable the accuracy and result of screw-down adjustment achieve the expected target.
出处 《冶金设备》 2016年第5期70-73,共4页 Metallurgical Equipment
关键词 精轧机 液压压下 电动压下 压下改造 Finish mill Hydraulic screw-down Electric screw-down Revamping of screw-down
  • 相关文献

参考文献3

  • 1姜明东 王国栋.高精度板带材轧制理论与实践[M].北京:冶金工业出版社,2000.337-338,358-362.
  • 2连家创,李春满.轧钢设备及工艺.东北重型机械学院出版社,1979.
  • 3中国金属学会板带学术委员会.中国热轧宽带钢轧机及生产技术.北京:冶金工业出版社,2004.

共引文献5

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部