工程返工管理的国际研究进展 被引量:2

Review on the International Research Status of Construction Rework Management
下载PDF
导出
摘要 在国际文献中有很多工程返工管理的研究成果,而国内研究者还很少关注此问题。在系统综述工程返工管理的国际研究进展基础上,归纳该领域三个主要的研究主题,探讨研究该问题的重要性,分析现有研究成果存在的问题或局限性,并就国内开展工程返工管理研究方向提出建议。 Research on the rework management is popular in international journals. However,it is not an attractive topic for Chinese researchers. Based on the literature review of international rework management research,this paper summarizes three main topics in the field,explores the importance of rework management research,analyzes the limitation of the existing studies,and suggests the future research directions of rework management for Chinese researchers.
作者 张尚
出处 《建筑经济》 2016年第11期32-37,共6页 Construction Economy
基金 重庆市博士后特别资助科研项目(Xm2014071)
关键词 工程返工 返工成本 返工管理 国际研究 construction rework rework cost rework management international research
  • 相关文献

参考文献30

  • 1Love, P. E. D, Edwards, D.J. Smith J, Walker D.H.T. Divergence or congruence? A path model of rework for building and civil engineering projects[J]. Journal of Performance of Constructed Facilities, 2009, 23 (6) .. 480-488.
  • 2Atkinson, J, Rogge, D. F, Haggard, R. The field rework index: early warning for field rework and cost growth [R]. Construction Industry Institute, Austin, 2001.
  • 3Salazar-Kish, J. M. Modeling concucy tradeoffs and their effects on project duration and rework [D]. CA. Stanford Univ, 2001.
  • 4Love P. E. D. Determinants of Rework in Australian Construction Projects[D].Austmlia. Monash University, 2001.
  • 5Feng, P. E-Y. Causes and effects of rework on the delivery of healthcare facilities in California [D].Berkeley: Univ. of Califomia, 2009.
  • 6Abdul-Rahman, H. The cost of non-conformance during a highway project: A case study[J]. Construction Management and Economics, 1995, 13 (1) : 23-32.
  • 7Love P.E.D, Mandal P, Li H. Determining the causal structure of rework influences in construction[J]. Construction Management and Economics, 1999, 17 (4) : 505-517.
  • 8Love P.E.D, Edwards D.J, Watson H, Davis P. Rework in civil infrastructure projects: Determination of cost predictors[J]. Journal of Construction Engineering and Management, 2010, 136 (3) : 275-282.
  • 9Love P. E.D. Auditing the indirect consequences of rework in construction: A case based approach[J]. Managerial Auditing Journal, 2002, 17 (3) : 138-146.
  • 10Love P. E. D. Influence of project type and procurement method on rework costs in building construction pmjects[J].Joumal of Construction Engineering and Management, 2002, 128 (1) : 18-29.

同被引文献18

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部