期刊文献+

某铁矿无底柱分段崩落法的参数优化研究 被引量:3

A Study on Parametric Opitimization of Pillarless Sublevel Caving for a Iron Ore
下载PDF
导出
摘要 结合云南某铁矿的生产地质条件和矿石的赋存条件,运用PFC3D数值模拟软件建立矿山采场的放矿模型,对该矿山采场结构参数,即崩矿步距,进路间距尺寸和分段高度进行优选。利用回贫差值大小衡量结构参数组合的优劣情况,即回贫差值越大,放矿效果越好,采场结构参数越优,反之,则差。通过正交试验设计建立9组不同的采场参数组合,并分别对9组试验验建立对应的PFC数值放矿模型,对最后的实验结果进行分析,经统计研究,最终确定该矿山的最优采场结构参数组合为分段高度为30 m,进路间距25 m,崩矿步距6 m。 Based on the geological conditions of production and the conditions of occurrence of an iron ore in Yunnan Province,the ore drawing model of mine stope was established by using PFC3D numerical simulation software.The structural parameters of the mine stope,that is,the interval of collapse and segment height.Using the difference between the poor and the poor,we know the structural parameters of the combination of the advantages and disadvantages of poor conditions is:the greater the difference back to the poor is,the better the effect of ore is,and stope structure parameters is better.Otherwise,it is poor.Nine sets of different stope parameter combinations were established by orthogonal experiment design,and the corresponding PFC numerical model was established respectively.The final experimental results were analyzed and statistically studied to determine the optimum of the mine.The combination of stope structure parameters is segment height of 30 m,with the approaching space of 25 m and collapse interval of 6 m.
出处 《中国锰业》 2016年第4期57-60,67,共5页 China Manganese Industry
关键词 结构参数 放矿指标 回贫差 正交试验 放矿模型 PFC3D Structural parameters Ore-drawing index Back-poor difference PFC3D Orthogonal test Ore drawing model
  • 相关文献

参考文献5

二级参考文献33

共引文献90

同被引文献131

引证文献3

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部