摘要 连续管入井深度受到测量装置的精度、连续管变形等因素的影响。特别是连续管累计起下行程越大时,其误差可能就越大,导致连续管起出井口时,操作人员无法准确判断其实际位置,易将连续管抽离防喷盒或携带的工具掉落井中。目前,有一种连续管起出报警装置在少数油田使用,但技术还不成熟,使用过程中存在滚轮偏磨、误报警、漏报警、控制电路不稳定等问题。针对现有装置,进行了滚轮总成、传感器总成、推杆总成和电路系统的改进设计。应用表明,改进后的连续管起出报警装置安装操作简单、灵敏度高、运行稳定可靠、无误报警、漏报警的情况发生,提高了连续管井下作业的安全性。 During the operation, CT depth is affected by the measuring accuracy and CT deformation. Especially when the CT total footage becomes large, the inaccuracy will be more, therefore the operator is not able to know the actual depth of the coiled tubing when running out the tub-ing, then the coiled tubing will be easily pulled out of the stripper or the attached tools fall down into the hole. There is a kind of run-out warning device being used in few oilfields currently,but it is immature,with the problems of roller wear,false alarm,missing alarm and unstable control circuit. Based on the existed device, this article optimizes the roller assembly, transducer assembly, push rod assembly and the circuit system. The application has shown that the improved run-out warning device is with the advantages of simple operation, high sensitivity, stable running, and it eliminates the false alarm and missing alarm,thus the safety performance of CT downhole operation has been highly improved.
出处 《石油矿场机械》 2016年第11期63-66,共4页 Oil Field Equipment
基金 中国石油天然气股份有限公司重大科技专项"碳纤维复合材料连续抽油杆制造技术开发及油田应用试验"(2013F-1301) 中国石油集团重大工程技术推广项目"连续管作业技术推广专项"(20120811)
关键词 连续管 报警装置 改进设计 coiled tubing warning device improvement design
  • 相关文献

参考文献6

二级参考文献39

  • 1武新军,康宜华,吴义峰,杨叔子.连续油管椭圆度在线磁性检测原理与方法[J].石油矿场机械,2001,30(6):12-14. 被引量:10
  • 2吴月先.连续油管井下作业范围扩大[J].石油矿场机械,2005,34(2):65-65. 被引量:2
  • 3彭秀英,卢飞平.溢流阀的压力整定值及其确定方法[J].贵州工业大学学报(自然科学版),2005,34(5):22-25. 被引量:4
  • 4Richard B. Microdrill Initiative Initial Market Evaluation[R]. U S: Department of Energy , 2003:9-11.
  • 5Roderic K Stanley.Results of Recent Inspections Performed on Coiled Tubing[R].SPE00054484,1999:25-26.
  • 6Pozos Lane.COILED TUBING MANUAL[Z].CTES,2005:31-32.
  • 7Roderic K Stanley.RESULTS FROM NDE INSPECTIONS OF COILED TUBING[R].SPE46023,1998:15-16.
  • 8CT Manual 2[Z].CTES,2006:57-58.
  • 9Kenneth R.Newman.A New Approach to Ultrasonic Coiled Tubing Inspection[R].SPE81722,2003:8-9.
  • 10黄志潜 高学和.连续油管作业技术文集[M].北京:石油工业出版社,1998.13-14.

共引文献233

同被引文献2

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部