期刊文献+

拉洛水利枢纽坝址承压水特征及其对建坝的影响 被引量:2

Characters of confined water in dam-site of Laluo Project and its impact on dam construction
下载PDF
导出
摘要 拉洛水利枢纽坝基岩石为板岩,板理裂隙、层间挤压带中赋存脉状裂隙性承压水。经过多年勘察研究,查明了承压水性质、分布及埋藏条件、水位、流量、水力联系,认为其对大坝稳定基本无不利影响,根据地质勘察建议优化了前期地基处理方案设计,减少了大量工程量。 The rock foundation of Laluo Dam is formed by slate that has fractures and vein-type fissure confined water in interlayer extrusion zone. After years of reconnaissance and study, the nature of confined water as well as its distribution and buried condition, water level, flow and hydraulic connection has identified. The rock foundation has no negative impact on the stability of dam. The design of foundation treatment in the early stage was optimized in accordance with information obtained from geological investigation which resulted in a dramatic reduction of quantity of construction work.
出处 《中国水利》 2016年第20期51-53,共3页 China Water Resources
关键词 拉洛 坝址 岩基 脉状裂隙性承压水 水力联系 帷幕灌浆 建坝影响 Laluo dam site rock foundation vein structural fissured water hydraulic connection curtain grouting influence of dam construction
  • 相关文献

参考文献3

  • 1陈志康,等.西藏拉洛水利枢纽及配套灌区工程初步设计报告[R].2014.
  • 2杜胜华,等.西藏拉洛水利枢纽及配套灌区工程初步设计阶段工程地质勘察报告[R].2014.
  • 3陈志康,等.西藏拉洛水利枢纽及配套灌区工程可行性研究报告[R],2012.

同被引文献8

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部