新疆焦煤集团1930平硐改扩建工程主、副斜井明槽段所处位置,冲积层和砾石层较厚,每个井筒涌水量均大于30m^3/h,明槽开挖难度较大。为此,根据地层特点,决定在明槽周围施工降水小井来降低施工范围内的静水位,减小涌水量,为明槽开挖创造良好条件。方案实施后,取得了预期效果。
The open cut sections of the mine main and auxiliary inclined shafts in the reconstruction of No.1930 Adit in Xinjiang Coking Coal Group were located in a thick alluvium and gravel bed.The water inflow volume of each mine inclined shaft was over 30m^3/h and the difficulty of the open cut excavation was high.Therefore according to the strata features,small dewatering wells made around the open cut were applied to reduce the still-water level within the construction scope.The water inflow volume reduced could create good conditions to the excavation of the open cut.After the construction plan completed,the expected effect was obtained.
作者
李忠华
刘海涛
LI Zhong-hua LIU Hai-tao(First Engineering Division, China Coal No. 5 Construction Company Limited, Xuzhou 221006, China)
出处
《建井技术》
2016年第4期11-12,45,共3页
Mine Construction Technology
关键词
斜井
明槽
降水小井
涌水量
mine inclined shaft
open cut
small dewatering well
water inflow volume