摘要
通过VBA编程,建立Auto CAD的模型空间和Excel表格中特征参数联系,批量绘制渠道横断面。通过实例证明该方法可有效减少工作量,提高工作效率。
This paper carries on procedural programming by using VBA. It connects the model space of AutoCAD with the characteristic data in the Excel that the programming draws the batch construction of ditches at one shot. It is proved that this method can both reduce workload and improve work efficiency.
出处
《广东水利水电》
2016年第8期61-64,共4页
Guangdong Water Resources and Hydropower