由于斜拉索的防护技术不尽完善,斜拉桥在运营若干年后,不可避免地会出现斜拉索腐蚀问题。为保证桥梁安全运营,国内外一些斜拉桥不得不进行换索。通过对一座独塔单索面斜拉桥的病害状况、成因分析、换索过程及换索效果进行阐述,以期为此类斜拉桥的换索提供技术支撑。
Owing to the imperfect protection technology of cable-stayed bridge, the stayed cable will be unavoidably corroded after the cable-stayed bridge is operated for several years. To ensure the safe operation of bridge, the cables of some cable-stayed bridges have to be replaced at home and abroad.According to the analysis on the fault status and cause of a single-pylon single-plane concrete cable-stayed bridge, the article sets forth the cable replacement process and effect in order to provide the technical support for the cable replacement of the similar cable-stayed bridges.
出处
《城市道桥与防洪》
2016年第11期41-44,51,共5页
Urban Roads Bridges & Flood Control
关键词
独塔
单索面
斜拉桥
换索
加固
single-pylon
single-plane
cable-stayed bridges
cable replacement
reinforcement