国家水资源监控能力建设项目试运行指标研究与实践 被引量:5

Research and Practice on Trial Run Indexes of Capacity Building Project of National Water Resources Monitoring
下载PDF
导出
摘要 试运行是检验项目成果,改善用户体验,提高系统效率的最后环节,是确保建成的系统以良好的功能性能状态,做好全面正式投入运行准备的关键环节。以试运行的工作组织和指标的研究设立为切入点,以取用水、水源地、水功能区、省界断面数据在水利部和流域及省级三级节点之间的贯通为重点,全面分析国家水资源监控能力建设项目(2012—2014年)试运行工作,为总体项目的最终验收提供参考。 As the last link to test the results of the project and improve the user experience and the efficiency of the system, trial run is the crucial link to ensure that systems built with good functional performance state and put into overall operational readiness. Based on the trail run work organization and indicator set as the breakthrough point, to take water, water source, and water function areas and provincial boundary cross sections of the river basin and the exchange between level 3 nodes as the important point, this article fully analyzes the overall trail run of the capacity building project of national water resources monitoring (2012-2014) and provides a reference for final project inspection.
作者 曾焱 韩鼎 ZENG Yan HANDing(Office of The Capacity Building Project of National Water Resources Monitoring of the Ministry of Water Resources, Beijing 100053, China Beijing Dong Hua He Chuang Technology Co., Ltd, Beijing 100190, China)
出处 《水利信息化》 2016年第5期31-38,共8页 Water Resources Informatization
关键词 水资源 监控能力建设 试运行 技术指标 上报率 完整率 及时率 water resources building of monitoring capacity trail run technical index reported rate integrity rate timeliness rate
  • 相关文献

参考文献4

  • 1曾焱,李暨,杨春生.国家水资源监控能力建设项目实施难点与对策的思考[J].水利信息化,2015(2):27-30. 被引量:8
  • 2水利部国家水资源监控能力建设项目办公室.关于开展国家水资源监控能力建设流域/省级项目整体试运行工作的通知(水资源办[2015]6号)[A].北京:水利部国家水资源监控能力建设项目办公室,2015.
  • 3水利部办公厅.关于开展国家水资源监控能力建设项目(2012-2014年)总体试运行工作的通知(水资源函[2016]374号)[A].北京:水利部水资源司,2016.
  • 4水利部国家水资源监控能力建设项目办公室.国家水资源监控能力建设项目(2012-2014年)总体试运行工作报告[R].北京:水利部国家水资源监控能力建设项目办公室,2016.

共引文献7

引证文献5

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部