期刊文献+

装备技术需求多方案优选方法研究

Research on Military Equipment Technical Requirements Scheme Selection Method
下载PDF
导出
摘要 针对单一优选准则带来的装备技术需求多方案优选结果的片面性及可能拒绝可行方案带来的风险,采用综合评估的思路,建立了由需求满足度、技术先进程度、技术重要度和技术成熟度等构成的指标体系,分别建立了需求满足度、技术先进程度、技术重要度和技术成熟度的求解方法,从而实现了装备技术需求的多视角综合优选,克服了单一准则下优选方案的偏差,最后通过示例验证了方法的可行性。 Single rule always brings about lopsided view of military equipment technical requirements scheme selection. Meanwhile there was risk to miss practical scheme. In order to solve the problem, according to the comprehensive evaluation train of thought, an index system consists of requirement satisfaction degree, technical progressiveness, technical importance degree, and technical readiness level was established. The methods to ascertain requirement satisfaction degree, technical progressiveness, technical importance degree, and technical readiness level were advanced, thus integrated military equipment technical requirements scberne selection comes into reality from multiple angle of view. The shortcoming of scheme selection biases is overcame. At last an example was given to demonstrated the feasibility of the method.
机构地区 装甲兵工程学院
出处 《计算机测量与控制》 2016年第11期104-106,114,共4页 Computer Measurement &Control
关键词 技术需求 方案优选 质量功能配置 需求满足度 成熟度评估 technical requirement scheme selection quality function deployment requirement satisfaction degree readiness level assessment
  • 相关文献

参考文献1

二级参考文献2

  • 1AKAO Y. QFD: past, present, and future [C]//Proeeedings of International Symposium on QFD'97. Linkoping, Sweden: Linkoping University, 1997:19-29.
  • 2WANG Wenping,DENG Julong. Fundamental study of relational analysis in grey system[C]//Proceedings the 2nd International Sysmposium on Uncertainty Modeling and Analysis. Washington, D.C., USA: IEEE, 1993: 25-28.

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部