期刊文献+

清远抽水蓄能电站主机设备结构设计及制造工艺修改意见综述 被引量:22

Review on Amendments of the Main Equipment Structure Design and Manufacturing Process of Qingyuan Pumped Storage Power Station
下载PDF
导出
摘要 本文简要介绍清远抽水蓄能电站建设过程中,业主方技术人员充分汲取多个抽水蓄能电站安装调试的经验教训,从有利于运行、检修的角度,有理有据地提出了对机组重要部件设计和制造工艺的建设性意见,并与制造厂家进行了深层次的磋商、探讨,而作为设计制作的东芝水电(杭州)有限公司均能予以高度重视,充分体现了与制造厂方密切合作、共同提高的态度。清远抽水蓄能电站1、2、3号机组顺利投入商业运行,机组各项性能性能指标优异,运行质量达到了国内外同类型机组的新高度。 In the process of Qingyuan pumped storage power station construction, this paper briefly introduces user's proposed amendments of the main equipment design manufacture process, and the concrete implementation,with manufacturer sitfully embodies the style of the close cooperation and common improvement. The unit 1,23 of QPSPS have put into commercial operation, the unit performance index is excellent and the operation quality reaches a highly new level among the same type units at home and aboard.
出处 《水电与抽水蓄能》 2016年第5期7-21,共15页 Hydropower and Pumped Storage
关键词 顶盖组合缝 导水机构 转轮 进水阀枢轴 厚环板磁轭 磁极铁芯 head cover combined seam water guide mechanism turbine inlet valve pivot thick annular plate magnetic yoke thick annular plate magnetic yoke pole core
  • 相关文献

同被引文献53

引证文献22

二级引证文献57

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部