摘要
介绍了杭州某工程的特点及地质条件,根据该项目场地的普查情况,提出了两种基坑围护工程施工方案,并从安全性、造价、工期三方面比选出了最优的方案,经实践证明,所选方案达到了预期的施工效果。
The paper introduces the features and geological conditions of some project in Hangzhou,points out the two foundation pit fender projects according to the census of the site,selects the optimal scheme from the safety,cost,and construction period,and proves by the practice that the scheme can achieve the expected results.
出处
《山西建筑》
2016年第31期93-95,共3页
Shanxi Architecture
关键词
基坑
围护桩
止水帷幕
造价
foundation pit
fender pile
waterproof curtain
cost