澳门轻轨高架桥节段箱梁施工控制研究 被引量:1

Construction Control of Segmental Box Girder of Macao Light Railway Viaduct
下载PDF
导出
摘要 研究了澳门轻轨高架桥节段箱梁施工控制。以澳门轻轨高架桥为工程背景,制定详细的监控方案,阐述施工控制思路,施工控制流程和施工控制内容,认真完成了准备阶段、预制阶段和安装阶段各个阶段的监控,着重研究了节段箱梁段安装过程中的线形控制和应力控制,对今后类似工程的施工控制有参考价值。 Construction control of segmental box girder of Macao light railway viaducts was studied. Taking Macao light railway viaduct as an instance, detailed monitoring scheme was planned. Construction control ideas were described also. Monitoring at all stages has been carefully completed, with being focused on the geometry control and stress control during the installation of segmental box girder, which could provide experience for similar projects construction.
出处 《安阳工学院学报》 2016年第6期34-37,共4页 Journal of Anyang Institute of Technology
基金 河南省科技厅产学研合作项目(2015HNCXY011)
关键词 高架桥 节段箱梁 施工控制 线形控制 viaduct segmental box girder construction control geometry control
  • 相关文献

参考文献8

二级参考文献34

共引文献58

同被引文献1

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部