摘要
针对地质构造复杂区域,在进行地质规律分析与总结的基础上,充分利用三维地震勘探成果,经过系统化思考,优化设计,准确避开断层发育程度高的块段,成功布置出储量达130万t的工作面,缓解了矿井接续紧张的局面,为煤矿机械化开采提供了保障,取得了良好的经济效益。三维地震勘探成果作为工作面设计的依据,具有较高的准确性和确切的实际应用价值。
For areas with complex geological structure, in geological regularity analysis and summary based, with the full use of mine 3D seismic exploration results and systematic thinking, successfully designed a coal winning face with reserves of 130 million tons that accurated away from the blocks with high development degree of faults. This action provided a guarantee for the high efficiency of mechanized coal mining, and easing the tension of coal production ,thus achieved good economic benefits. As a basis of the design, the 3D seismic exploration results have high accuracy and the exact value in practical application.
出处
《山东煤炭科技》
2016年第11期159-160,166,共3页
Shandong Coal Science and Technology
关键词
三维勘探
工作面设计
系统布置
煤炭生产
3D seismic exploration coal winning face design organic arrangement coal production